Manufacturer customize 26-28 ton Excavator two-section demolition 18m long reach boom arm for CAT326 CAT330 PC260
Our Features:
1. Fashionable style
2. Professional Team
3. Quality control
4. Moderate price
5. CE certification
6. Promptly answer
Excavator demolition boom accessaries 1 kit linkage assembly | 6 high pressure hoses | 4 pins |
1 kit pre-installed pipeline | 3 butter hoses | 1 bucket cylinder |
There are two types of demolition boom arm
1. Two-stage demolition boom arm is mainly for 6-30 tons of excavators to carry out
modification, the maximum length of modification can reach 24 meters, two-stage demolition arm movements flexible, work fast.
2. Third-segment demolition boom arm is mainly for the 25-90 tons of excavators to be modified, the maximum length of modification can reach 40 meters of length, the movement of the third-segment demolition boom is relatively slow, but the demolition height is high, easy to use.



